UK Grid News

Great Britain's grid, in numbers

What the electricity system is doing right now and through the year. Live figures refresh every 5 minutes from Elexon, NESO and Sheffield Solar.

Right now

Live figures for Great Britain, refreshed every 5 minutes.

Grid right now

Loading live data…
Demand
– 
Carbon intensity
– 
Renewables
– 
Largest source
– 
Frequency
– 
Net imports
– 

Generation mix, last 24 hours

Gigawatts by source, half-hourly. Imports count as a source because they meet demand like one.

Sources: Elexon BMRS (FUELHH), Sheffield Solar PV_Live

Grid frequency

Supply and demand must balance every second. Frequency drops below 50 Hz when supply falls short, and NESO keeps it between 49.8 and 50.2 Hz in normal operation.

Source: Elexon BMRS (FREQ)

The connection queue

In November 2026, 592 GW of generation and storage projects held contracts to connect to Great Britain's transmission network but were not yet built. Battery storage features in 63% of it, either alone or alongside solar. 55 GW has planning consent or is being built, and 147 GW is due to connect by the end of 2030. We save NESO's register every month (since November 2026), so the chart can show how the queue changes over time. Latest connections reform news →

The connection queue

Projects with a contract to connect to Great Britain's transmission network that are not yet built, from NESO's TEC register, November 2026.

592GW
waiting to connect, across 1,676 projects
63%
includes battery storage, alone or with solar
9%
has planning consent or is being built
Source: NESO Transmission Entry Capacity register (NESO Open Data Licence). Projects listing several technologies are grouped by the first that applies: offshore wind, nuclear, onshore wind, solar with storage, solar, storage, gas.

Interconnector trade

In October 2026, Great Britain was a net importer of electricity, bringing in 1.2 TWh more than it sent out. The biggest source of imports was Norway (755 GWh). Power flowed out to Ireland (372 GWh) and Northern Ireland (148 GWh).

Source: Elexon BMRS (live: FUELINST, every 5 minutes; monthly: FUELHH). Map simplified.

When Britain uses electricity

In 2025, average national demand peaked at 44.0 GW around 17:00 in the week of 8 January, and was lowest, 17.4 GW, around 04:00 in the week of 28 May. Darker cells mean more demand. Summer middays are paler because rooftop solar meets demand before it reaches the transmission network.

Source: NESO historic demand data (national demand). Updated yearly.

About this data

  • Generation, demand and frequency: Elexon BMRS, under the Elexon data licence. Covers power stations on the transmission network; small wind farms and rooftop solar on local networks are not included.
  • Solar: Sheffield Solar PV_Live estimates, which include rooftop panels.
  • Carbon intensity: NESO Carbon Intensity API (CC BY 4.0).
  • Demand through the year and the TEC register: NESO Data Portal, under the NESO Open Data Licence.
  • Live "demand" here is generation plus net imports, including estimated solar, so it reads a little differently from NESO's own demand figures.